| Company | Contributor | Case Study Title |
|---|
![]() |
Mark Clayton - Cross | DBP00147 - Remote Separator Alarms |
![]() |
John Hackett - Interserve | DBP00146 - Boss X3 Micro Powered Platform |
![]() |
Peter Austin - Amec | DBP00095 - Cast-In Sockets For Temporary Balustrading |
![]() |
Sara Sutton - Bullock | DBP00084 - Dry Lining of Brick and Block Walls |
![]() |
Chris Achilles - Peers | DBP00080 - Coloured Bolt Bags |
![]() |
Peter Hargreaves - Multi Design | DBP00079 - Steel Plate Plug Detail |
![]() |
Stewart Dunmore - Multi Design | DBP00056 - Infilling of concrete walls below completed slabs |
| DBP00013 - Clean Technique for Slab Break Out and Removal of Upper Floor Slabs |
||
| DBP00009 - Modular Construction of Stone Panels |
||
| DBP00002 - Trimming tops of Concrete Piles |
||
| DBP00001 - Demolition work within existing buildings |